Asphalt pavement has wear, which manifests itself in the development of cracks, the formation of potholes. To avoid the appearance of defects, regular repairs are practiced, allowing you to extend the service life of the canvas at a small cost. How this procedure is carried out – it is proposed to find out more information on https://ukpotholes.co.uk/services/pothole-repairs/.
Rules
Among the requirements that should be observed during repairs, the following are distinguished:
- The procedure is carried out in the warm season and dry period. It is proposed to use Tarmac Resurfacing from an experienced company with qualified performers.
- You can use the technology of laying hot and cold asphalt. The latter option is used primarily in winter, if urgent restoration of the road surface is required.
- When carrying out work, it is necessary to clean the defect, remove any small mechanical particles, for which blowing or industrial vacuum cleaners are used.
The edges of the crack or pothole must be widened if there are destroyed areas so that these elements do not lead to the development of the defect in the future. Usually the pothole is given a rectangular shape. After cleaning, the edges and bottom of the pothole are treated with liquid bitumen to improve the adhesion of new and old asphalt, to create a tight seal of the seams. This can be done clearly and correctly by a Pothole repair contractor.
The laid asphalt must be compacted with a vibrating plate or roller to ensure the required density indicators that match the old pavement.
The new section must be leveled relative to the entire road surface, the asphalt is protected from moisture penetration, and it is prevented from sticking to car tires.
Advice
You should contact companies that have the appropriate equipment, specialists and possess various technologies for restoring asphalt pavement. They will take into account the general condition of the road, the local climate, accurately determine the nature of the defect, and carry out the necessary preparatory work so that the patches withstand the required service life. The intensity of traffic and the loads exerted on the road surface will be taken into account.
It is better to carry out work in the season with stable positive air temperatures and no precipitation. The presence of water and other substances complicates adhesion; liquid particles that get inside the pavement will be one of the reasons for the rapid destruction of the asphalt. It is essential to follow the recipe for the asphalt used; it must match the old surface.