The summer vacation is cool, but even better when you can fulfill your dreams and soak up in your bassine. Many will think that this is not for their feed. But this is not so! The pool you can build with your own hands.
The pool in the country can become not only entertainment, but also a useful thing for watering the garden.
Before building a pool, you need to think over the drain and a set of water.
Let’s start building a bassine. First you need to decide on the size of the bass. The size of the bassine depends on how much free space is on your site. If you have a large site, then it is not necessary to make a huge pool t.to. There will be problems with the drain of water, and besides, huge pools are not durable. If you want to record the process of reconstruction of Bassin use -Creative Video operator price. All types of video services on Video-Creative
It is better to place the pool closer to the water supply, where the smallest plants.
Forms of the pool. They can be in the form of a square, a rectangle, circle and out.
And now we will start directly to the construction of the pool. Let’s start by marking the boundaries. For this we need pegs and a meter. It is necessary to increase the boundaries by 50 centimeters so that the walls of the pool could be made. The same must be done with the bottom. Ideal depth 1.2-1.6.
The walls should be with a small slope in the outside (3-5 degrees), this will help them not scatter over time.
The following point is to compact the soil and align it. Sand about 30 centimeters high is applied to the ground. Waterproofing roofing material or bitumen mastics is laid on these two layers. This layer is not good to put in two layers so that a little goes to the walls of the pool. The walls of the pool must be treated with tin, plastic or wood.
The distance between the processed walls and the soil should be 40 centimeters.
This distance must be poured with concrete. The strength of the walls can be given by making a steel grid. Rods of wire-roller rods are laid in the yet frozen concrete. Where the rods are flicked, they need to be connected with a soft wire.
In order for the grid to be inside concrete, you can put stones under it. The bottom must be made as smooth as possible with a slope for draining water.
When the concrete dries, it is necessary to remove the formwork from the walls. Cover the walls with cement milk.
We will make a drain pipe before we start concreting. On the one hand, there should be a water valve on the other bias in a drain hole.
That’s all the instructions for building a pool. It is very difficult and even real. Enjoy your rest with new buildings.
———————————————————————————–
The strength and stability of the building are closely interconnected and mutually determine each other, depend on the reliability of structures and their mutual connection. A fairly high qualification of work is needed, so you should focus on the instructions given on the site of the construction of houses.