Elastic seamless coating is a bulk floor. Polymeric foundations act as the main component used in the process of creating. Premises with special operating conditions – it is there most often such gender is used. Production and storage facilities are classified as such premises. Such a floor is also created in repair shop houses and laboratories. In such rooms, you can install a concrete floor. However, it has a number of shortcomings. During its operation, a large amount of dust is distinguished. When cleaning its surfaces, there are big problems. Another disadvantage of such sexes is that it is not resistant to aggressive environments. Due to their effects, it is often crumbled, its abrasion and cracking occurs. And this makes you look for coatings that have high operational characteristics.
In the premises of housing, as well as in office premises, bulk floors can be used, the industrial price for them is acceptable therefore used almost everywhere. But in the buildings and buildings of industrial purpose, certain requirements are imposed on the flooring. Special properties are given to the industrial seizure through the use of compounds with various ratios of components, due to which its compliance is ensured by the requirements of further operation.
Resistance to heat, cold and sharp temperature differences are the main advantages of industrial bulk floors. In addition, they differ in antistatic properties, vapor permeability, and immune to excess water.
A high degree of adhesion characteristic of the bulk floor makes it possible to apply it to any surface. But all the same, before applying the floor, in accordance with all technological conditions, its preparation should be carried out. It is necessary to clean the base from dust, on which the floor will be applied. If a special grinding machine can be used for cleaning this. All chips and cracks identified on the surface must be eliminated. Having completed cleaning, you can do primer. This is done to increase adhesion with subsequent layers. The base layer is applied. Using a spatula, provide the necessary layer thickness. After that, the bubbles are removed, which could appear after pouring. Then the surface is rolled using deeps. Seven days – this is where it is required to completely dry the floor. But after three days you can walk on coating. When laying the bulk floor, it is necessary to avoid the temperature difference in the room. The duration of the stages in the process of laying this coating depends on the characteristics of the bulk floor of a particular manufacturer.